 vvsandClaude Opus 5
|
29ab49599c
|
PREREG before code and run: when is lengthening appropriate - G1 confirmed geometric series of three steps, G2 repeating step pattern with the period from the data (gate S_R > 1/2), G3 steps AND results (1/(1-min(S_step, S_res)), S_res = 0 after a sign change). Five-way paired grid, criteria Y1-Y6, stop rule: accept only if Y1, Y2 and Y3 all hold.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
|
2026-09-21 12:16:25 +01:00 |
|